FCE Logo
US Federal Contractor Registration
434-244-0250
158 Industrial Way / Suite 203
Troy, VA 22974

Bailey Bridge Road Realignment - Chesterfield

Phase: Bidding

construction of approximately 2,480 LF of shoulder widening and pavement resurfacing from Spring Run Road to Sunday Silence Lane. The widening shall consist of resurfacing the existing pavement, providing 7-foot wide shoulders (5-foot paved and 2- foot graded) on both sides of Bailey Bridge Road, and replacing existing corrugated metal culverts with concrete pipe. The project will also reconstruct two substandard horizon radius requirement for a 35 mph Design Speed.

Contact Rick Gibson

PDF  Geotech Report
PDF  Project Plans
PDF  Project Specifications

To view or download the Project Files listed above, you must be Logged In.