FCE Logo
US Federal Contractor Registration
434-244-0250
158 Industrial Way / Suite 203
Troy, VA 22974

Bailey Bridge Road Realignment - Chesterfield

Phase: Bidding

Project Bid Due: 2:00 PM on Thursday, March 28, 2019

construction of approximately 2,480 LF of shoulder widening and pavement resurfacing from Spring Run Road to Sunday Silence Lane. The widening shall consist of resurfacing the existing pavement, providing 7-foot wide shoulders (5-foot paved and 2- foot graded) on both sides of Bailey Bridge Road, and replacing existing corrugated metal culverts with concrete pipe. The project will also reconstruct two substandard horizon radius requirement for a 35 mph Design Speed.

Contact Rick Gibson

PDF  Geotech Report
PDF  Project Plans
PDF  Project Specifications

To view or download the Project Files listed above, you must be Logged In.