FCE Logo
US Federal Contractor Registration
434-244-0250
158 Industrial Way / Suite 203
Troy, VA 22974

Midtown Connector - Lynchburg, VA

Phase: Completed

Roadway construction including turn lanes, pavement widening, roundabout, median islands, new sidewalk construction, stormwater management basins, drainage system networks, installation of new traffic signals, and associated traffic control.

Contact Will Ashwell

PDF  Midtown Connector Specs
PDF  Midtown Plans Part A
PDF  Midtown Plans Part B
PDF  Midtown Plans Part C
PDF  Midtown Plans Part D
PDF  Midtown Plans Part E

To view or download the Project Files listed above, you must be Logged In.